A DIN1000 (40 inch) wastewater pipe at a global top 10 pulp plant was causing severe structural damage—breaking the surrounding concrete every two years.
Our piping design, pipe stress, support design, and civil teams took on the challenge:
✅ Simulated the current conditions to identify why the existing design was failing.
✅ Engineered a targeted 3-part intervention that minimized loads to within safe design limits.
The result? A durable, efficient solution that extends asset life and reduces costly repairs.
Smart engineering delivers real results. If your plant faces similar challenges, let's talk.
Gabriel Angielczyk Dávila Juan Pablo Masoller Hidalgo
