top of page
PROYECTOS

Storage capacity optimization

Pulp & Paper

Brownfield project, achieving significant cost reductions through early clash detection in the design phase.

Key Information

Critical assembly

66m height

Cost reduction

Early interference detection

Location

Uruguay

Date

2020 - 2021

Surfista al atardecer
Servicios involucrados

Construction Management

Procurement Management

Servicios involucrados

Design Management

Instrumentation & Control

Electrical

Mechanical & Process

Civil, Structural & Architecture

Project Overview

A major client aimed to expand its internal pulp storage capacity to maximize annual production. Our role focused on serving as the integrating link between the process provider and various technical disciplines.

The primary goal was to consolidate multi-area requirements into an integrated, functional design, ensuring constructability and operational efficiency.

Our Company Scope

Integrated design management: Coordination and consolidation of all technical disciplines, translating process requirements into integrated engineering solutions to prevent cost overruns due to interferences.

Tender document: Preparation of detailed technical specifications and bidding documents to ensure contractor alignment with project standards.

Site supervision: On-site technical direction to ensure construction quality and strict compliance with delivery deadlines.

High-altitude lifting engineering: Planning and supervision of the critical assembly maneuver for the main tank at a height of 66 meters.

Equipo principal del proyecto

Gabriel Labarthe

Mechanical Engineer

Renzo Stefani

Architect

Marcos Menéndez

Mechanical Engineer